Start

Case studies
Final report Case studies Partners

 

Case studies

In order to study the practical aspects of implementing potential indicator sets the present project included a pilot phase consisting of three case studies. The ‘cases’ selected were: Malpensa Airport near Milano (Italy); London Heathrow (UK); and Amsterdam Airport Schiphol (The Netherlands). Before the work on the cases started we compiled a list of 71 indicators. Among the 71 indicators 16 were labeled as ‘first choice’. These represented our preference at the time of beginning of the pilot phase. Given the restraints in time and resources these had to be studied with first priority. It should be pointed out that the ‘first choice’ differs from the recommended indicator set.

Download the indicator set the reports of the case studies by clicking the links below.

Heathrow case study

Malpensa case study

Schiphol case study

71 indicators

 

U kunt een e-mailbericht met vragen of opmerkingen over deze website verzenden aan wfpas@wxs.nl.
Laatst bijgewerkt: 10 October 2002